2026 Road Projects
Roads to be seal coated:
King Road (Blank Rd to Wanner Rd)
Blank Road (Route 340 to Plank Rd)
Plank Road (bridge to Churchtown Rd)
Plank Road (Route 340 to bridge)
Wanner Road (King Road to Churchtown Rd)
Wanner Road (Cambridge Rd to Red Hill Rd)
Beaver Dam Road (Churchtown Rd to Byerly Rd)
Beaver Dam Road (Guy Rd to township line)
Millwood Road (Amish Rd to Cut Rd)
Roads to be completely rebuilt:
Mt. Pleasant Road (Churchtown Rd to township line)
Roads to receive Ultra Thin process (thin layer of blacktop):
Glen Oaks Development
Roads to receive Cold in Place (blacktop process):
Laurel Lane
Primrose Lane
Dogwood Drive
